• Textile Screen Printing Dryer
  • Textile Screen Printing Dryer
  • Textile Screen Printing Dryer
  • Textile Screen Printing Dryer
  • Textile Screen Printing Dryer
  • Textile Screen Printing Dryer

Textile Screen Printing Dryer

Movement Way: Combined
Heating Mode: Radioactive
Material Status: Strap
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Textile Screen Printing Dryer pictures & photos
Textile Screen Printing Dryer
US $17,000-20,000 / Set
Min. Order: 1 Set
Gold Member Since 2013

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
TM-IR4m-jet
Drying Medium
Air
Operation Pressure
Vacuum Dryer
Type
Infrared Drying Ovens
Heating Zone Dimension
4000 * W 800 *H 150mm
Dimensions
4100 * 1200 * 1400mm
Power
380V 3phase 50Hz
Package
4.3*1.4*1.6m
Model No.
TM-IR4m-Jet
Structure
Oven
Operational Method
Continuous
Appearance of Dried Sample
Wet Paper
Transport Package
Plywood
Specification
CE; ISO9001-2000
Trademark
Tamprinter
Origin
Guangdong, China
HS Code
8514300090
Production Capacity
50sets/Month

Packaging & Delivery

Package Size
400.00cm * 80.00cm * 150.00cm
Package Gross Weight
580.000kg

Product Description

Nonwoven Jet Tunnel dryer

 Warning

              Please read this operation manual carefully before working

 

Content

1     Safety instruction. 3

1.1      Safety regulation. 4

1.2      Warning signs (figure/photo) 5

1.3      The interpretation of signs 6

2     Specification. 7

2.1      Machine function and feature. 8

2.2      Machine's model and nameplate. 8

2.3      Specification table. 11

2.4      Machine noise value. 12

2.5      Main parts(figure)... 12

2.6      Machine dimension(figure)... 13

2.7      Circuit diagram . 13

3     Installation. 15

3.1      Transit safety item.. 15

3.2      Transit method. 15

3.3      Installing place selection. 16

3.4      Installation method/(picture) 16

3.5      Installation and level adjustment 17

3.6      Power source requirement 17

3.7      Exterior power source connection. 18

3.8      Power source inspection. 18

4     Operation. 19

4.1      Operation position(figure) 19

4.2      Operation panel instruction. 19

4.3      Emergence stop. 20

4.4      Operation precedure. 20

4.5      Machine adjustment 21

5     Maintenance. 23

5.1      Machine day,week,year maintenance. 23

5.2      Machine lubrication. 25

5.3      Machine malfunction and handling. 25

6     Machine waste disposal 26

7     Safety and protection. 27

2         Specification

  1. machine's working principle & function and feature

Working principle:

Hot air furnace blowing hot air so that non-woven moisture evaporation.

Dry hot stove in the electronics, food, pharmaceutical, printing, packaging, cleaning, heat treatment ... ... the industry has a very wide range of applications.

Function and feature:

  1. Dry hot stove with stainless steel heating pipe heating air for hot air, clean and sanitary, in line with environmental protection..
  2. Multi-fiber insulation cotton insulation, the use of safe and reliable, long-term high temperature work.
  3. Standard type of hot air fan application patented design of the cooling device, air volume adjustment using VDF speed, more energy saving, high controllability, heat loss and other excellent features.
  4. Equipped with double overheating overload protection device, fully guarantee the safety of equipment. Set the thermocouple outlet, direct detection, the outlet temperature.
    1. Model and machine nameplate
  5. Specification table

Model Parameter

TM-IR4m-jet

Tunnel Width(mm)

650

Power(P/V/Hz)

3/380/50

Heat pipe(KW)

3pcs*6kwX 2Group=36

VDF power(W)

1.5KW*2PCS

Total power(KW)

40

Tunnel Dimension(L*W*H)

4050*1010*1680

Electric box (L*W*H)mm

600*600*960

Weight(kg)

580



Note:All specification, dimension and design will not change if there is not any notice.

        Installation

 

3.1       Transit safety item

1.  During transiting (moving or loading and unloading vehicles), machine should be moved by fork-lift and kept the balance. Carry it by carriage or container.

2.  Use the enough load capability fork-lift to transit machine.

  1. When move the machine, you can ask others to lead the ways and watch the safety.

4.  During transiting,it should avoid collision and bad weather. And pay attention to protect the machine' surface painting from damaging. When need to save the machine temporarily, please place it in a dry and room temperature environment. 

5.  The fork lift must be driven by the experienced driver.

6.  The equipment can be moved by push. But be caution the speed.

7.  As the installation position plan, choose the proper installation position, and notice to keep enough distance with the surrounding barrier.

8.  When install the machine, the machine's longitudinal and transverse level can be adjusted by the adjusting screw at four corners.

9.  If the equipment is damaged or short of parts, please don't run it.

 

3.2 Transit method

1.Machine can be moved by fork lift.

2.Fork lift should insert the bottom of the machine.

3.Keep the balance of machine when moving it.

3.3  Installing place selection

Please run the machine in follow situation
 

Environment

Environment

temperature

-10ºC~45ºC(no ice cover)

Environment

humidity

Bellow 90%RH(no dew)

Save temperature

-20ºC~+65ºC

Environment

In room

(No causticity,flammable gas,paint dust)

Altitude height

Below 1000m

 

3.4  Installation method/figure

 When installing the machine, there must be more than 1.5 m distance between the wall and machine. 3m spaces also have to be left for equipment operation.

 

3.5  Installation and level adjustment

Install this machine in the solid state reinforced concrete, and excess space can be used to place the work piece .When machine installed in the correct place, you can adjust machine longitudinal and transverse level by the adjusting screw at four corners.

 

3.6   Power source requirement

If the power source' voltage is not enough, it will affect the motor's output and the controller's function.

It is very important to use the correct voltage to connect the machine and the power source. And only use the independent power source.

 

3.7   Exterior power source connection

Before connect the power source wire, you must make sure whether the machine voltage is the same as factory' power source voltage.

Connect the wire to L1, L2, L3 ,N,PE.

After connected the wire, make sure it is connected on the right Joints (figure)

Machine must be correct grounding so as to prevent from electric shock. Machine should be operated by the qualified electrician.
 

Textile Screen Printing Dryer



3.8   Power source inspection

  

Power Switch                                      power source switch

 

1.After connect the power source,it is very necessary to check whether the wire are  connect to the joints correct.

2. Rotate main switch on electric controller.

3. open the electrical control box, try to change three phase L1L2L3 sequence, Check whether the electrical source' three phase wires are connected correct. Phase sequence indicator  LED Light Up is OK

 If not, exchange any two wires connection of three phase line L1, L2, L3.

4.  Above operation should be operated by the qualified electrician.

 

4.      Operation

4.1Operation position (figure)

4.2   Operation panel instruction

 

4.3  Emergency stop

 

During the machine running, if there are any abnormal function occurred; press this button to stop all movement. When resume of this button, first switches all vdf at the min position.

 

4.4  Operational procedures

Figure  1                          

               

1,Before the first start-up, machinery should be checked whether grounding, then user should pay attention to check whether the grounding line remains firmly grounded everyday.

2,Before start-up , the protective covers and protective doors should be closed, or

choose to use tape to seal the leaky mouth AIR pipe to avoiding workshop temprature raise.

3,First turn power switch to the right (Figure 1), the main power lines in electronic

control box are connected, and fan starts to work..

4,Periodically check the electrical wiring for circuit phenomenon.10,Adjust the belt tension on both sides to prevent the belt running to the false way.

5,Having good hygiene, to prevent dust.

6,If there is an imminently hazardous situation, immediately turn off the main power switch, to avoid further accidents.


Our company's certifican and honor.
Textile Screen Printing Dryer


Welcome to contact us if you have any question!
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Textile Screen Printing Dryer pictures & photos
Textile Screen Printing Dryer
US $17,000-20,000 / Set
Min. Order: 1 Set
Gold Member Since 2013

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company
Management System Certification
ISO 9001
OEM/ODM Availability
Yes